Scope of Work
A- Pre lay seabed survey.
B- Shore End landing of Cables.
C- Remove floaters from the cable.
D- Post lay survey for the cable.
E- Installation of lockable pipes to protect the cable from sharp edges of rocks or coral reefs.
Scope of Work A- Installation of geotextile at offshore trench bottom…
Scope of Work A- geotechnical investigation. B- Bathymetric and side scan..
Scope of Work A- Dredging for onshore trench with 300m length…
Scope of Work A- Operation assistance, routine inspection and maintenance B-..
Scope of Work A- Replacement of Ammonia loading hose. B- Visual..
Scope of Work ⦁ Sandblasting and surface preparation. ⦁ MPI for..
⦁ Location: Aswan Dam. ⦁ Client: GEICO ⦁ Purpose: ROV inspection..
⦁ Location: GEMSA field Platform, Red Sea, Egypt. ⦁ Client: GEMEPTCO..
⦁ Location: Kuwait ⦁ Client: KNPC ⦁ Purpose: Develop new offshore..
